Stormwater repairs planned for Tamworth CBD levee
Key points
- Tamworth Regional Council plans major repairs to ageing stormwater infrastructure beneath the Peel River levee that protects the city centre. Inspections found several deteriorating outlets between Bligh and Murray streets, and some will need complete reconstruction.
- The damage was found after more detailed checks prompted by an incomplete floodgate closure in 2025. Council says initial works will reline and maintain outlets that are still sound, with reconstruction tendered in 2027.
- A contingency plan will add protection for the CBD if major flooding occurs before permanent repairs are finished.
Get local alerts + the full feed in the AU Now app
Alerts, Shorts and your saved stories — free on Google Play.
Disclaimer
This is an AI-generated summary based on reporting by NE Times. It may not reflect every detail of the original story exactly. Tap “Continue reading” above for the full, original article.
Follow this story in the AU Now app
Alerts for your suburb, Shorts and saved stories — free on Google Play.
Comments
No comments yet — start the conversation.