AU Now
Get the app

Stormwater repairs planned for Tamworth CBD levee

Key points

  • Tamworth Regional Council plans major repairs to ageing stormwater infrastructure beneath the Peel River levee that protects the city centre. Inspections found several deteriorating outlets between Bligh and Murray streets, and some will need complete reconstruction.
  • The damage was found after more detailed checks prompted by an incomplete floodgate closure in 2025. Council says initial works will reline and maintain outlets that are still sound, with reconstruction tendered in 2027.
  • A contingency plan will add protection for the CBD if major flooding occurs before permanent repairs are finished.
Stormwater repairs planned for Tamworth CBD levee
Photo: NE Times

Get local alerts + the full feed in the AU Now app

Alerts, Shorts and your saved stories — free on Google Play.

Get the app
Continue reading · NE Times
Disclaimer

This is an AI-generated summary based on reporting by NE Times. It may not reflect every detail of the original story exactly. Tap “Continue reading” above for the full, original article.

Follow this story in the AU Now app

Alerts for your suburb, Shorts and saved stories — free on Google Play.

Get the app

Advertise with AU Now →

Join the conversation

You can read freely. Sign in only to join the conversation.

Signing in on the website is coming soon. For now, use the AU Now app to like, comment, save and follow.

Get the app
MAKE IT LOCAL

Where should your news begin?

Choose your home area for nearby stories, weather and alerts.

Start typing to find your area.

Comments

…